Bathroom Remodel Checklist & Tips

Redesigning a shower room is an outstanding means to revitalize your space and also increase your house’s worth at the same time. Remodeling a bathroom can be as easy as using a new coat of paint or getting a brand-new sink and components. Or you can go large– begin with a fresh slate and also give the bathroom an entirely face-lift. Whatever updates you’re imagining, it will certainly pay to prepare ahead.

On average, renovating a bathroom expenses in between $5,000 and $10,000. The even more major the project, the extra it will set you back. One method to manage costs is to prepare well in advance. You can use the Mr. Handyman’s Bathroom Remodel Checklist as an overview for making wise decisions, budgeting and also preventing unpleasant shocks – so you can create a terrific washroom without paying additional.

Bathroom Remodel Tips

  • Set a list of priorities and expectations.
    • What is your big-picture goal?
    • When does the job need to be finished?
  • Set a budget.
    • How much do you want to do? New shower and more square footage? Or just a new sink and a coat of paint? Make these decisions now before you start remodeling. Don’t forget the details, like the knobs on the new cabinets and the light switch covers.
  • Choose a color palette or design style.
    • Stay consistent with color and material choices, and choose options that are cohesive with the design in the rest of the house.
  • Source your materials and permits.
    • Talk to manufacturers. Look into alternative eco-friendly, low-VOC or moisture-resistant materials.
    • Consider upgrades such as a bathroom fan, electric heater or radiant-heated floors.
    • Try to purchase as much as possible before you begin.
  • Plan logistics.
    • Find out if you’ll need to plumb the toilet or shower or if you can you use existing pipes.
    • Check shipping periods to make sure you can get all the materials in time.
    • Line up a contractor or, if you’re doing the work yourself, clear your schedule.
    • Will the remodel require enough tear-out that you’ll need to seal off other rooms from dust or noise?
  • Anticipate obstacles.
    • Will the subfloor need to be replaced?
    • Will the new tub fit through the door?
    • Can the existing wiring be used?
    • Will the inspection officer be available during the remodel process?
  • Create a timeline.
    • Make a list that follows a logical timeline: Don’t repaint before caulking, and don’t finish the tile floor before installing the shower.
  • Get creative.
    • Think outside the box for a unique look: shiplap walls, board and batten, beadboard or tiles.
    • Look for unique lights and furniture at thrift stores.